ASR Construction Group
ASR Construction Group
  • Home
  • About Us
    • About ASR
    • Self-Perform Crews
  • Services
  • Projects
  • Culture
  • Contact
    • Contact Us
    • Hiring
  • More
    • Home
    • About Us
      • About ASR
      • Self-Perform Crews
    • Services
    • Projects
    • Culture
    • Contact
      • Contact Us
      • Hiring
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
    • About ASR
    • Self-Perform Crews
  • Services
  • Projects
  • Culture
  • Contact
    • Contact Us
    • Hiring

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
City of Chandler

Lone Butte WRF Spool and Air Valve Release (ARV) Replacement

Chandler, AZ

About This Project

This emergency repair project  included removing and replacing (2) 18' ductile iron pipe header spools and Air Release Valve (ARV) assemblies. Upon discovering the air release had blown, one of the pumps was unable to continue running. ASR was onsite immediately and had welders completing a temporary fix within 2 hours to allow the pump to continue operations. ASR then underwent custom pipe fabrications and returned for a permanent fix. 

Project Highlights

  • Emergency Repair with 2-Hour Response Time
  • 96% Self-Performed

Return to Featured Projects

Main Office

1620 S Stapley Dr, Suite 100

Mesa, AZ 85204


Shop & Deliveries

481 E Baseline Rd, Suite 103

Gilbert, AZ 85233


AZ ROC 330940 A-General Engineering  |  AZ ROC 330947 B-1 General Commercial


Copyright © 2024 ASR Construction Group - All Rights Reserved.

  • Home
  • About ASR
  • Self-Perform Crews
  • Services
  • Projects
  • Culture
  • Contact Us

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept